‘Kalite yönetimi’ temasıyla ilgili kısaltmalar
- Kod
-
Anlam
Dil
Temalar ve yerler
- MTEM
-
Maintenance Test Equipment Module
La mallongigo MTEM (Maintenance Test Equipment Module) inkluzivas la mallongigojn MTE (Maintenance Test Equipment) kaj TE (Test Equipment).
- MTEM
-
Maintenance Test Equipment, Mechanical
La mallongigo MTEM (Maintenance Test Equipment, Mechanical) inkluzivas la mallongigojn MTE (Maintenance Test Equipment) kaj TE (Test Equipment).
- MTEO
-
Maintenance Test Equipment, Optical
La mallongigo MTEO (Maintenance Test Equipment, Optical) inkluzivas la mallongigojn MTE (Maintenance Test Equipment) kaj TE (Test Equipment).
- MTMO
-
Mated Test Management Office
- MTO
-
Mississippi Test Operations
- MTP
-
Master Test Plan
La mallongigo MTP (Master Test Plan) inkluzivas la mallongigon TP (Test Plan).
- MTP
-
Mission Test Plan
La mallongigo MTP (Mission Test Plan) inkluzivas la mallongigon TP (Test Plan).
- MTRD
-
Master Test Requirement Document
- MTS
-
Methods for Testing and Specification
- MTTF
-
Mean Time To Failure
- MTTFF
-
Mean Time To First Failure
- MUAHAG
-
Military Usage and Harmonization Advisory Group
The CECC/UG MUAHAG (Military Usage and Harmonization Advisory Group) has promoted the use of the CECC system for the procurement of electronic components for military applications by: - formulating procedures for the choice and procurement of electronic components; - preparing lists of preferred components for military usage; - receiving reports from national military procurement agencies on their experience of implementation of the CECC system; - providing feedback to the appropriate CECC WGs on any shortcomings observed in CECC specifications, or in the national or international implementation of the CECC system.
- MV
-
Manufacturing Verification
- MVGVT
-
Mated Vertical Ground Vibration Test
- MVP
-
Master Verification Plan
- MYVAL
-
Maintainability Evaluation
- MatEv
-
Materials Evaluation
- MiRe
-
Microelectronics Reliability
- NAPCTC
-
North American Policy Council for OSI (Open Systems Interconnection) Testing and Certification
- NAT
-
Non-conformance Action Team
- NATF
-
Naval Air Test Facility
La mallongigo NATF (Naval Air Test Facility) inkluzivas la mallongigon TF (Test Facility).
- NAVT
-
NASA Altimeter Verification Telemetry
- NCB
-
National Certification Body
NCB = ONC (Organisme National de Certification) fransızcada.
- NCIDQ
-
National Council for Interior Design Certification
- NDE
-
Nondestructive Evaluation
- NDI
-
Nondestructive Inspection
- NDTF
-
Nondestructive Test Facility
La mallongigo NDTF (Nondestructive Test Facility) inkluzivas la mallongigon TF (Test Facility).
- NEVADA
-
Net Energy Verification And Determination Analyzer
- NOD
-
Notice Of Discrepancy
- NOP
-
Normal Operating Procedure
La mallongigo NOP (Normal Operating Procedure) inkluzivas la mallongigon OP (Operating Procedure).
- NOR
-
Notice Of Revision
- NORMCERQ
-
Secrétariat régional de la Normalisation, de la Certification et de la promotion de la Qualité
- NPD
-
Nominal Percent Defective
- NRA
-
Notes de Référence à Appliquer
- NRS
-
Non-conformance Reporting System
- NSCCA
-
Nuclear Safety Cross-Check Analysis
- NTD
-
NASA Test Director
- NTF
-
National Test Facility
La mallongigo NTF (National Test Facility) estas inkluzivita en la mallongigo INTF (Interim National Test Facility), kaj ĝi inkluzivas la mallongigon TF (Test Facility).
- NTR
-
Notifications of Test Results
- NTRAC
-
New Technical Regulations Applications Committee
- NV
-
NASA Altimeter Verification
- NVAO
-
Nederlands-Vlaamse Accreditatieorganisatie (https://www.nvao.net/nl)
- OAC
-
Orbital Activation and Checkout
- OAFTO
-
Orbiter Atmospheric Flight Test Office
La mallongigo OAFTO (Orbiter Atmospheric Flight Test Office) inkluzivas la mallongigon FT (Flight Test).
- OASCB
-
Orbiter Avionics Software Control Board
La mallongigo OASCB (Orbiter Avionics Software Control Board) inkluzivas la mallongigon CB (Control Board).
- OAT
-
Operational Acceptance Test
- OAT
-
Overall Test
- OBC
-
On-Board Checkout
La mallongigo OBC (On-Board Checkout) estas inkluzivita en la mallongigo OBCS (On-Board Checkout Subsystem).
- OBCS
-
On-Board Checkout Subsystem
La mallongigo OBCS (On-Board Checkout Subsystem) inkluzivas la mallongigon OBC (On-Board Checkout).
- OBDU
-
On-Board Diagnostic Unit
- OCA
-
Orbiter Capability Assessment
- OCC
-
Office of Contract Compliance
- OCDR
-
Orbiter Critical Design Review
La mallongigo OCDR (Orbiter Critical Design Review) inkluzivas la mallongigojn CDR (Critical Design Review) kaj DR (Design Review).
- OCG
-
OSTC (Open Systems Testing Consortium) Certification Group
- OCN
-
Operation Control Number
- OCP
-
Operations Checkout Procedure
- OCR
-
Operational Concept Review
La mallongigo OCR (Operational Concept Review) estas inkluzivita en la mallongigo FOCR (Final Operational Concept Review).
- OCS
-
On-Board Checkout System
- ODRAN
-
Operational Drawing Revision Advance Notice
- OFCC
-
Office of Federal Contract Compliance
La mallongigo OFCC (Office of Federal Contract Compliance) estas inkluzivita en la mallongigo OFCCP (Office of Federal Contract Compliance Programs).
- OFCCP
-
Office of Federal Contract Compliance Programs (https://www.dol.gov/agencies/ofccp)
La mallongigo OFCCP (Office of Federal Contract Compliance Programs) inkluzivas la mallongigon OFCC (Office of Federal Contract Compliance).
- OFT
-
Operational Flight Test
La mallongigo OFT (Operational Flight Test) inkluzivas la mallongigon FT (Flight Test).
- OFT
-
Orbital Flight Test
La mallongigo OFT (Orbital Flight Test) estas inkluzivita en la mallongigo OFTDS (Orbital Flight Test Data System), kaj ĝi inkluzivas la mallongigon FT (Flight Test).
- OFTDS
-
Orbital Flight Test Data System
La mallongigo OFTDS (Orbital Flight Test Data System) inkluzivas la mallongigojn FT (Flight Test) kaj OFT (Orbital Flight Test).
- OIB
-
Operating Improvement Board
- OIC
-
Orbital Integrated Checkout
- OIO
-
Opération Inter-Organisme
- OIR
-
Operations Integration Review
- OISR
-
Open Item Status Report
La mallongigo OISR (Open Item Status Report) inkluzivas la mallongigon SR (Status Report).
- OIVS
-
Orbiter Interface Verification Set
- OMCF
-
Orbiter Maintenance and Checkout Facility
- OMPR
-
Operational Maintainability Problem Reporting
La mallongigo OMPR (Operational Maintainability Problem Reporting) inkluzivas la mallongigon PR (Problem Report).
- OMR
-
Orbiter Management Review
La mallongigo OMR (Orbiter Management Review) inkluzivas la mallongigon MR (Management Review).
- OMRB
-
Operating Material Review Board
La mallongigo OMRB (Operating Material Review Board) inkluzivas la mallongigojn MR (Material Review), MRB (Material Review Board) kaj RB (Review Board).
- OMRC
-
Operational Maintenance Requirements Catalog
- OMRF
-
Orbiter Modification and Refurbishment Facility
- OMRP
-
Operations and Maintenance Requirements Plan
- OMRS
-
Operations and Maintenance Requirements and Specifications
- OMRS
-
Operations and Maintenance Requirements System
- OMRSCB
-
Operations and Maintenance Requirements and Control Board
La mallongigo OMRSCB (Operations and Maintenance Requirements and Control Board) inkluzivas la mallongigon CB (Control Board).
- OMRSD
-
Operations and Maintenance Requirements and Specifications Document
- ONC
-
Organisme National de Certification
ONC = NCB, ONC (yukarıyı görmek).
- OOR
-
On-Orbit Review
- OP
-
Operating Procedure
La mallongigo OP (Operating Procedure) estas inkluzivita en la mallongigoj CSOP (Crew Systems Operating Procedure), SOP (Standard Operating Procedure), JOP (Joint Operating Procedure), NOP (Normal Operating Procedure), OSOP (Orbiter Systems Operating Procedure), QAOP (Quality Assurance Operating Procedure), QCOP (Quality Control Operating Procedure), SOP (Subsystems Operating Procedure), SSOP (Space Systems Operating Procedure), TOP (Technical Operating Procedure) kaj DOP (Detailed Operating Procedure).
- OPC
-
Opel Performance Center
- OPM
-
Operations Procedure Manual
- OPQCM
-
Office Professionnel de Qualification des Conseils en Management
- OPR
-
Operations Planning Review
- ORA
-
Operational Requirements Analysis
- ORB
-
Operations Review Board
La mallongigo ORB (Operations Review Board) inkluzivas la mallongigon RB (Review Board).
- ORD
-
Operational Readiness Data
- ORD
-
Operations Requirements Document
La mallongigo ORD (Operations Requirements Document) inkluzivas la mallongigon RD (Requirements Document).
- ORD
-
Orbital Requirements Document
La mallongigo ORD (Orbital Requirements Document) inkluzivas la mallongigon RD (Requirements Document).
- ORI
-
Operational Readiness Inspection
- ORR
-
Operational Readiness Review
La mallongigo ORR (Operational Readiness Review) inkluzivas la mallongigon RR (Readiness Review).
- ORR
-
Operations Requirements Review
La mallongigo ORR (Operations Requirements Review) estas inkluzivita en la mallongigo PORR (Preliminary Operations Requirements Review), kaj ĝi inkluzivas la mallongigon RR (Requirements Review).
- ORT
-
Operational Readiness Test
- ORT
-
Orbit Readiness Test
- OSART
-
Operational Safety Assessment Review Team
- OSCN
-
Orbiter Specification Change Notice
La mallongigo OSCN (Orbiter Specification Change Notice) inkluzivas la mallongigojn CN (Change Notice) kaj SCN (Specification Change Notice).
- OSCR
-
Orbiter Software Change Request
La mallongigo OSCR (Orbiter Software Change Request) inkluzivas la mallongigojn CR (Change Request), SC (Software Change) kaj SCR (Software Change Request).
- OSDH
-
Orbiter System Definition Handbook
- OSOP
-
Orbiter Systems Operating Procedure
La mallongigo OSOP (Orbiter Systems Operating Procedure) inkluzivas la mallongigon OP (Operating Procedure).
- OSRBD
-
Operational Software Reliability Benchmark Development
- OSSE
-
Observing System Simulation Experiment
- OSSRH
-
Orbiter Subsystem Requirements Handbook
- OSTC
-
Open Systems Testing Consortium
- OSTF
-
Off-Site Test Facility
La mallongigo OSTF (Off-Site Test Facility) inkluzivas la mallongigon TF (Test Facility).
- OSTP
-
Orbiting System Test Plan
La mallongigo OSTP (Orbiting System Test Plan) inkluzivas la mallongigon TP (Test Plan).
- OT&E
-
Operational Test and Evaluation
- OTC
-
Orbiter Test Conductor
La mallongigo OTC (Orbiter Test Conductor) inkluzivas la mallongigon TC (Test Conductor).
- OTD
-
Orbiter Test Director
- OTE
-
Optical Test and Evaluation
- OTEC
-
Operational Test and Evaluation Center
- OTL
-
OSI (Open Systems Interconnection) Testing Liaison
- OTP
-
Operational Test Procedure
La mallongigo OTP (Operational Test Procedure) inkluzivas la mallongigon TP (Test Procedure).
- OTP
-
Outline Test Plan
La mallongigo OTP (Outline Test Plan) inkluzivas la mallongigon TP (Test Plan).
- OTS
-
Orbital Test System
- OTV
-
Orbit Test Vehicle
- OVA
-
Organisme Vérificateur Agréé
- OVI
-
Operational Validation Inspection
- P&I
-
Performance and Interface
- P&PQ
-
Productivity and Product Quality
- P&PQI
-
Productivity and Product Quality Improvement
- P&PQIC
-
Productivity and Product Quality Improvement Council
- P&Q
-
Productivity and Quality
- P&R
-
Performance and Resources
- P3I
-
Preplanned Product Improvement
- P3I
-
Preplanned Production Improvement
- PAA
-
Problem Assessment Area
- PAC
-
Problem Action Center
- PACC
-
Problem Action Control Center
La mallongigo PACC (Problem Action Control Center) inkluzivas la mallongigon CC (Control Center).
- PACE
-
Prelaunch Automatic Checkout Equipment
- PACE
-
Product Acceptance Configuration Element
- PACO
-
Prelaunch Automatic Checkout
- PADS
-
Problem Action Data System
- PAE
-
Preventive Action Engineer
- PAE
-
Problem Assessment Engineering
- PAIS
-
Product Assurance Information System
- PAP
-
Product Assurance Plan
- PAP
-
Projet Annuel de Performance
La mallongigo PAP (Projet Annuel de Performance) estas inkluzivita en la mallongigoj PAPA (Projet Annuel de Performance Académique) kaj PAPE (Projet Annuel de Performance d’Établissement).
- PAPA
-
Projet Annuel de Performance Académique
La mallongigo PAPA (Projet Annuel de Performance Académique) inkluzivas la mallongigon PAP (Projet Annuel de Performance).
- PAPE
-
Projet Annuel de Performance d’Établissement
La mallongigo PAPE (Projet Annuel de Performance d’Établissement) inkluzivas la mallongigon PAP (Projet Annuel de Performance).
- PAPG
-
Plan d’Amélioration de la Productivité Globale
- PAPL
-
Project-Approved Parts List
- PAQ
-
Plan d’Assurance Qualité
- PAR
-
Problem Accountability Record
- PAR
-
Problem Action Report
- PAR
-
Problem Action Request
La mallongigo PAR (Problem Action Request) inkluzivas la mallongigon AR (Action Request).
- PAR
-
Product Acceptance Review
La mallongigo PAR (Product Acceptance Review) inkluzivas la mallongigon AR (Acceptance Review).
- PARB
-
Problem Assessment Review Board
La mallongigo PARB (Problem Assessment Review Board) inkluzivas la mallongigon RB (Review Board).
- PAS
-
Publicly Available Specification
- PAS
-
Problem Assessment System
- PASR
-
Problem Analysis Status Report
La mallongigo PASR (Problem Analysis Status Report) inkluzivas la mallongigon SR (Status Report).
- PAT
-
Problem Action Team
- PAT
-
Production Acceptance Test
- PATE
-
Performance Analysis, Test, and Evaluation
- PATH
-
Performance Analysis and Test History
- PC&PM
-
Program Control and Performance Management
La mallongigo PC&PM (Program Control and Performance Management) inkluzivas la mallongigon PM (Performance Management).
- PCA
-
Physical Configuration Audit
- PCA
-
Production Configuration Audit
- PCASS
-
Program Compliance Assurance and Status System
- PCB
-
Parts Control Board
La mallongigo PCB (Parts Control Board) inkluzivas la mallongigon CB (Control Board).
- PCB
-
Program Change Board
- PCC
-
Pad Control Center
La mallongigo PCC (Pad Control Center) inkluzivas la mallongigon CC (Control Center).
- PCC
-
Payload Control and Checkout
- PCCB
-
Program Change Control Board
La mallongigo PCCB (Program Change Control Board) inkluzivas la mallongigojn CB (Control Board) kaj CCB (Change Control Board).
- PCCB
-
Program Configuration Control Board
La mallongigo PCCB (Program Configuration Control Board) inkluzivas la mallongigojn CB (Control Board) kaj CCB (Configuration Control Board).
- PCCM
-
Program Change Control Management
- PCCP
-
Preliminary Contract Change Proposal
La mallongigo PCCP (Preliminary Contract Change Proposal) inkluzivas la mallongigojn CCP (Contract Change Proposal) kaj CP (Change Proposal).
- PCD
-
Procurement Control Document
- PCF
-
Payload Control Facility
- PCI
-
Programme de Contrôle Interne
- PCI
-
Plan de Contrôle Interne
- PCL
-
Programming Checklist
- PCM
-
Parts Control Management
- PCN
-
Page Change Notice
La mallongigo PCN (Page Change Notice) inkluzivas la mallongigon CN (Change Notice).
- PCN
-
Program Change Notice
La mallongigo PCN (Program Change Notice) inkluzivas la mallongigon CN (Change Notice).
- PCO
-
Program Control Officer
- PCO
-
Publications Control Officer
- PCP
-
Project Change Proposal
La mallongigo PCP (Project Change Proposal) inkluzivas la mallongigon CP (Change Proposal).
- PCP
-
Program Change Proposal
La mallongigo PCP (Program Change Proposal) inkluzivas la mallongigon CP (Change Proposal).
- PCR
-
Payload Checkout Room
- PCR
-
Power Change Request
La mallongigo PCR (Power Change Request) inkluzivas la mallongigon CR (Change Request).
- PCR
-
Procedure Change Request
La mallongigo PCR (Procedure Change Request) inkluzivas la mallongigon CR (Change Request).
- PCR
-
Program Change Request
La mallongigo PCR (Program Change Request) inkluzivas la mallongigon CR (Change Request).
- PCR
-
Project Control Room
La mallongigo PCR (Project Control Room) inkluzivas la mallongigon CR (Control Room).
- PCR
-
Publication Change Request
La mallongigo PCR (Publication Change Request) inkluzivas la mallongigon CR (Change Request).
- PCRB
-
Project Change Review Board
La mallongigo PCRB (Project Change Review Board) inkluzivas la mallongigon RB (Review Board).
- PCRB
-
Program Change Review Board
La mallongigo PCRB (Program Change Review Board) inkluzivas la mallongigon RB (Review Board).
- PCRS
-
Performance and Cost Report System
- PCS
-
Procedure Completion Sheet
- PCS
-
Payload Checkout System
- PCS
-
Performance Control System
- PCT
-
Photometric Calibration Test
- PCTE
-
Portable Commercial Test Equipment
La mallongigo PCTE (Portable Commercial Test Equipment) inkluzivas la mallongigon TE (Test Equipment).
- PCTR
-
Protocol Conformance Test Report
La mallongigo PCTR (Protocol Conformance Test Report) inkluzivas la mallongigon TR (Test Report).
- PCU
-
Payload Checkout Unit
La mallongigo PCU (Payload Checkout Unit) estas inkluzivita en la mallongigo PPCU (Partial Payload Checkout Unit).
- PCV
-
Precheck Verification
- PCVB
-
Pyro Continuity Verification Box