‘Kalite yönetimi’ temasıyla ilgili kısaltmalar
- Kod
-
Anlam
Dil
Temalar ve yerler
- QCD
-
Qualité, Coûts, Délais
- QCDR
-
Quality Control Deficiency Report
La mallongigo QCDR (Quality Control Deficiency Report) inkluzivas la mallongigon QC (Quality Control).
- QCOP
-
Quality Control Operating Procedure
La mallongigo QCOP (Quality Control Operating Procedure) inkluzivas la mallongigojn OP (Operating Procedure) kaj QC (Quality Control).
- QCS
-
Qualified Calibration Source
- QDR
-
Qualification Design Review
La mallongigo QDR (Qualification Design Review) estas inkluzivita en la mallongigo CQDR (Critical Qualification Design Review), kaj ĝi inkluzivas la mallongigon DR (Design Review).
- QDS
-
Quality Data System
- QE
-
Quality Engineer
- QE
-
Quality Engineering
- QFD
-
Quality Function Deployment
- QFD
-
Quality Functional Deployment
- QI
-
Quality Information
- QI
-
Qualification Initiale
- QIC
-
Quality Information Control
- QIS
-
Quality Improvement Service
- QM
-
Qualification Motor
- QMS
-
Quality Management System
La mallongigo QMS (Quality Management System) estas inkluzivita en la mallongigo SQMS (Scottish Quality Management System).
- QMS
-
Qualification Model Spacecraft
- QO
-
Qualification Opérationnelle
- QOS
-
Quality Operating System
- QP
-
Qualification des Performances
- QPD
-
Quality Planning Document
- QPL
-
Qualified Parts List
- QPL
-
Qualified Products List
- QPP
-
Quality Program Plan
- QPRD
-
Quality Planning Requirements Document
La mallongigo QPRD (Quality Planning Requirements Document) inkluzivas la mallongigon RD (Requirements Document).
- QPRD
-
Quality Program Requirements Document
La mallongigo QPRD (Quality Program Requirements Document) inkluzivas la mallongigojn PR (Program Requirements) kaj RD (Requirements Document).
- QPRH
-
Quality Planning Requirements Handbook
- QPSD
-
Quality and Productivity Systems Division
- QR
-
Qualification Review
La mallongigo QR (Qualification Review) estas inkluzivita en la mallongigoj CDQR (Critical Design and Qualification Review), FQR (Final Qualification Review), FQR (Formal Qualification Review) kaj QRS (Qualification Review Sheet).
- QRS
-
Qualification Review Sheet
La mallongigo QRS (Qualification Review Sheet) inkluzivas la mallongigon QR (Qualification Review).
- QS
-
Quality System
- QS
-
Qualité Sûreté
- QSA
-
Qualification Site Approval
- QSE
-
Qualité, Sécurité, Environnement
- QSGVT
-
Quarter-Scale Ground Vibration Test
- QSII
-
Qualité et Sécurité des Installations Intérieures
- QSL
-
Qualified Source List
- QT
-
Qualification Test
La mallongigo QT (Qualification Test) estas inkluzivita en la mallongigoj FQT (Formal Qualification Test), PQT (Preliminary Qualification Test), QTP (Qualification Test Plan), QTP (Qualification Test Procedure), QTR (Qualification Test Report), QTV (Qualification Test Vehicle), PPQT (Preproduction Qualification Test) kaj PQT (Production Qualification Test).
- QTP
-
Qualification Test Plan
La mallongigo QTP (Qualification Test Plan) inkluzivas la mallongigojn QT (Qualification Test) kaj TP (Test Plan).
- QTP
-
Qualification Test Procedure
La mallongigo QTP (Qualification Test Procedure) inkluzivas la mallongigojn QT (Qualification Test) kaj TP (Test Procedure).
- QTR
-
Qualification Test Report
La mallongigo QTR (Qualification Test Report) inkluzivas la mallongigojn QT (Qualification Test) kaj TR (Test Report).
- QTV
-
Qualification Test Vehicle
La mallongigo QTV (Qualification Test Vehicle) inkluzivas la mallongigon QT (Qualification Test).
- QUADS
-
Quality Achievement Data System
- QUIC
-
Quality Data Information and Control
- QUIC
-
Quality Information Control
- QUP
-
Quality Unit Pack
- QVT
-
Qualified Verification Testing
- QVVT
-
Qualified Verification Vibration Testing
- QoS
-
Quality of Service
- R&M
-
Reliability and Maintainability
- R&QA
-
Reliability and Quality Assurance
La mallongigo R&QA (Reliability and Quality Assurance) inkluzivas la mallongigon QA (Quality Assurance).
- R&S
-
Reliability and Safety
- RAC
-
Reliability Action Center
- RACCS
-
Remote Automatic Checkout and Calibration System
- RACF
-
Resource Access Control Facility
- RAF
-
Requirements Analysis Form
- RAI
-
Review Action Item
La mallongigo RAI (Review Action Item) inkluzivas la mallongigon AI (Action Item).
- RAM
-
Reliability Assessment Model
- RAM
-
Requirements Allocation Matrix
- RAP
-
Reliability Assurance Program
- RAP
-
Rapport Annuel de Performance
- RAQ
-
Responsable Assurance Qualité
- RAS
-
Requirements Allocation Sheet
- RB
-
Review Board
La mallongigo RB (Review Board) estas inkluzivita en la mallongigoj CARB (Central Acquisition Review Board), CLRB (Cost Limit Review Board), CMRB (Contractor Material Review Board), CRB (Change Review Board), CRB (Concept Review Board), CRB (Configuration Review Board), CRB (Correspondence Review Board), ERB (Engineering Review Board), FRB (Failure Review Board), IRB (Institutional Review Board), HCRB (Hardware Configuration Review Board), ICRB (Interface Change Review Board), ISMRB (Information Systems Management Review Board), ISRB (Integrated System Review Board), ITRB (Integrated Technical Review Board), JRB (Joint Review Board), MRB (Material Review Board), OMRB (Operating Material Review Board), ORB (Operations Review Board), PARB (Problem Assessment Review Board), PCRB (Project Change Review Board), PMRB (Primary Material Review Board), PORB (Production Operations Review Board), PPRB (Preliminary Proposal Review Board), PRB (Panel Review Board), PRB (Program Review Board), PRRB (Payload Requirements Review Board), SERB (Shuttle Engineering Review Board), SERB (Support Equipment Review Board), SERB (Systems Engineering Review Board), RRB (Requirements Review Board), SCRB (Software Configuration Review Board), SCRB (STSOC Configuration Review Board), SDRB (Software Design Review Board), SRB (Safety Review Board), SRB (Software Review Board), TCRB (Test Change Review Board), TCRB (Test Criteria Review Board), TDRB (Tool Design Review Board), TRB (Test Review Board), DRB (Design Review Board), HSIRB (Health Sciences Institutional Review Board), PRB (President’s Review Board) kaj PCRB (Program Change Review Board).
- RCCB
-
Rockwell Configuration Control Board
La mallongigo RCCB (Rockwell Configuration Control Board) inkluzivas la mallongigojn CB (Control Board) kaj CCB (Configuration Control Board).
- RCI
-
Request for Contract Investigation
- RCL
-
Reliability Control Level
- RCM
-
Reliability-Centered Maintenance
- RCN
-
Requirements Change Notice
La mallongigo RCN (Requirements Change Notice) inkluzivas la mallongigon CN (Change Notice).
- RCR
-
Requirements Change Request
La mallongigo RCR (Requirements Change Request) inkluzivas la mallongigon CR (Change Request).
- RCS
-
Revision Control System
- RCS
-
Requirements Collection System
- RD
-
Requirements Document
La mallongigo RD (Requirements Document) estas inkluzivita en la mallongigoj BCRD (Basic Consolidated Requirements Document), FDRD (Flight Definition and Requirements Document), FERD (Facility and Equipment Requirements Document), GIRD (Ground Integration Requirements Document), FRD (Flight Requirements Document), FRD (Functional Requirements Document), FTRD (Flight Test Requirements Document), FTRD (Functional Test Requirements Document), GORD (Ground Operations Requirements Document), IDMRD (Intermediate and Depot Maintenance Requirements Document), IDRD (Information Definition Requirements Document), IRD (Information Requirements Document), IRD (Integration Requirements Document), IRD (Interface Requirements Document), ITRD (Integrated Test Requirements Document), KPRD (KSC (Kennedy Space Center) Program Requirements Document), LRD (Launch Requirements Document), MDRD (Mission Data Requirements Document), MORD (Medical Operations Requirements Document), MRD (Mission Requirements Document), ORD (Operations Requirements Document), ORD (Orbital Requirements Document), PDRD (Procurement Data Requirements Document), PORD (Performance and Operations Requirements Document), PRD (Payload Requirements Document), PRD (Preliminary Requirements Document), PRD (Procurement Requirements Document), PRD (Program Requirements Document), PRD (Project Requirements Document), PSRD (Program Support Requirements Document), QPRD (Quality Planning Requirements Document), QPRD (Quality Program Requirements Document), SERD (SE Requirements Document), SMVRD (Shuttle Master Verification Requirements Document), SPRD (System Performance Requirements Document), SRD (Shuttle Requirements Document), SRD (Systems Requirements Document), SREM (System Requirement Engineering Methodology), STIRD (SAIL Test Implementation Requirements Document), TCRD (Test and Checkout Requirements Document), TRD (Technical Requirements Document), TRD (Test Requirements Document), EGORD (Experiment Ground Operations Requirements Document), DRD (Data Requirements Document), DRD (Design Requirements Document), DRD (Detailed Requirements Document) kaj DTRD (Development Test Requirements Document).
- RDC
-
Request for Design Change
La mallongigo RDC (Request for Design Change) inkluzivas la mallongigon DC (Design Change).
- RDC
-
Request for Document Change
- RDC
-
Request for Drawing Changes
- RDD
-
Requirements Definition Document
- RDP
-
Requirements Data Plan
- RDP
-
Requirements Development Plan
- RDT&E
-
Research, Development, Test, and Evaluation
- RE&T
-
Research, Engineering, and Test
- RECP
-
Request for Engineering Change Proposal
La mallongigo RECP (Request for Engineering Change Proposal) inkluzivas la mallongigojn EC (Engineering Change), CP (Change Proposal) kaj ECP (Engineering Change Proposal).
RECP = RFECP (Request For Engineering Change Proposal) İngilizcede.
- REE
-
Relevé d'Exécution d'Essais
- REX
-
Retour d'EXpérience
- RFC
-
Request For Change
- RFD
-
Requirements Formulation Document
- RFECP
-
Request For Engineering Change Proposal
La mallongigo RFECP (Request For Engineering Change Proposal) inkluzivas la mallongigojn EC (Engineering Change), CP (Change Proposal) kaj ECP (Engineering Change Proposal).
RFECP = RECP, RFECP (yukarıyı görmek).
- RFF
-
Rapport de Fin de Fabrication
- RFI
-
Rapport de Fin d'Intervention
- RFM
-
Rapport de Fin de Montage
- RFP
-
Requirements and Formulation Phase
- RFTA
-
Reverse Fault Tree Analysis
La mallongigo RFTA (Reverse Fault Tree Analysis) inkluzivas la mallongigon FTA (Fault Tree Analysis).
- RFTCP
-
Request For Test Change Proposal
La mallongigo RFTCP (Request For Test Change Proposal) inkluzivas la mallongigojn TC (Test Change) kaj CP (Change Proposal).
- RGRF
-
Repair Generation Rate Forecast
- RIADB
-
Rockwell Integrity Assurance Data Base
La mallongigo RIADB (Rockwell Integrity Assurance Data Base) inkluzivas la mallongigon DB (Data Base).
- RID
-
Review Item Disposition
- RIDI
-
Receiving Inspection Detailed Instruction
- RIGI
-
Receiving Inspection General Instruction
- RM&P
-
Reliability, Maintainability, and Producibility
- RM&QA
-
Reliability, Maintainability, and Quality Assurance
La mallongigo RM&QA (Reliability, Maintainability, and Quality Assurance) inkluzivas la mallongigon QA (Quality Assurance).
- RMA
-
Reliability, Maintainability, and Availability
- RMQ
-
Responsable Management Qualité
- RNPP
-
Reliability and Network Planning Panel
- RPE
-
Reliability Project Engineer
- RPP
-
Reliability Program Plan
- RR
-
Readiness Review
La mallongigo RR (Readiness Review) estas inkluzivita en la mallongigoj FRR (Flight Readiness Review), CARR (Customer Acceptance Readiness Review), CRR (Cargo Readiness Review), ETRR (Environmental Test Readiness Review), FFRR (First Flight Readiness Review), FRRID (Flight Readiness Review Item Disposition), FSRR (Flight Software Readiness Review), FSRR (Flight System Readiness Review), GORR (Ground Operation(s) Readiness Review), IRR (Independent Readiness Review), IRR (Integrated Readiness Review), LRR (Launch Readiness Review), LVFRR (Launch Vehicle Flight Readiness Review), MRR (Manufacturing Readiness Review), MRR (Mission Readiness Review), ORR (Operational Readiness Review), PMRR (Premanufacturing Readiness Review), PRR (Preflight Readiness Review), PRR (Production Readiness Review), SIRR (Software Integration Readiness Review), SRR (Site Readiness Review), SRR (Specification Readiness Review), SRR (Subcontractor Readiness Review), SRRID (Site Readiness Review Item Document), SVRR (Software Verification Readiness Review), SWRR (Software Readiness Review), TRR (Test Readiness Review) kaj VRR (Verification Readiness Review).
- RR
-
Requirements Review
La mallongigo RR (Requirements Review) estas inkluzivita en la mallongigoj CRR (Critical Requirements Review), IRR (Initial Requirements Review), IRR (Interface Requirements Review), ITRR (Integrated Technology Requirements Review), MRR (Mission Requirements Review), ORR (Operations Requirements Review), PDRR (Payload Design Requirements Review), PORR (Preliminary Operations Requirements Review), PRR (Preliminary Requirements Review), PRR (Program Requirements Review), PRR (Project Requirements Review), PRRB (Payload Requirements Review Board), PSRR (Preliminary Systems Requirements Review), SERR (SE Requirements Review), RRB (Requirements Review Board), SRR (Shuttle Requirements Review), SRR (Software Requirements Review), SRR (System Requirements Review), SSRR (Station Set Requirements Review), TRR (Technical Requirements Review), TRR (Test Requirements Review), DRR (Design Requirements Review) kaj DRRD (Design Requirements Review Disposition).
- RRB
-
Requirements Review Board
La mallongigo RRB (Requirements Review Board) inkluzivas la mallongigojn RR (Requirements Review) kaj RB (Review Board).
- RRQ
-
Responsable Régional Qualité
- RRW
-
Reliable Replacement Warhead
- RS-232
-
Recommended Standard 232
- RSD
-
Requirements and Specifications Document
- RSPL
-
Recommended Spare Parts List
- RTE
-
Responsible Test Engineer
- RTS
-
Reliability Test Specimen
- RTVM
-
Requirements and Test Verification Matrix
- RUM
-
Real User Measurement
- RVAS
-
Requirements Verification and Accounting System
- RVCF
-
Remote Vehicle Checkout Facility
- RVCN
-
Requirement Verification Completion Notice
La mallongigo RVCN (Requirement Verification Completion Notice) inkluzivas la mallongigon VCN (Verification Completion Notice).
- RVN
-
Requirements Verification Network
- RVR
-
Requirement Verification Revision
- RVRS
-
Requirements Verification Review Sheet
- ReNEv
-
Research in Nondestructive Evaluation
- S&MST
-
Space and Missile System Test
- SACTO
-
Sacramento Test Operations
- SAEPP
-
Sophicated Aero Engine Performance Program
- SAFE
-
Safing and Failure Detection Expert
- SAIA
-
Service Académique d’Inspection de l’Apprentissage
- SAM
-
Supportability Assessment Model
- SAMTEC
-
Space And Missile Test Center
- SAMTO
-
Space And Missile Test Organization
- SAR
-
Safety Analysis Report
La mallongigo SAR (Safety Analysis Report) estas inkluzivita en la mallongigo SARP (Safety Analysis Report for Packaging).
- SAR
-
System Assessment Review
- SAR
-
Special Action Requirement
- SAR
-
Subsequent Applications Review
- SARP
-
Safety Analysis Report for Packaging
La mallongigo SARP (Safety Analysis Report for Packaging) inkluzivas la mallongigon SAR (Safety Analysis Report).
- SASCB
-
Shuttle Avionics Software Control Board
La mallongigo SASCB (Shuttle Avionics Software Control Board) inkluzivas la mallongigon CB (Control Board).
- SASR
-
Shuttle Avionics Status Review
La mallongigo SASR (Shuttle Avionics Status Review) inkluzivas la mallongigon SR (Status Review).
- SASR
-
Shuttle Avionics System Review
- SASTP
-
Stand-Alone Self-Test Program
La mallongigo SASTP (Stand-Alone Self-Test Program) inkluzivas la mallongigon STP (Self-Test Program).
- SAT
-
Smart Automatic Test
- SATE
-
Semi-Automatic Test Equipment
La mallongigo SATE (Semi-Automatic Test Equipment) inkluzivas la mallongigojn TE (Test Equipment) kaj ATE (Automatic Test Equipment).
- SATS
-
Shuttle Avionics Test Set
- SATS
-
Shuttle Avionics Test Station
- SATS
-
Station Accommodation Test Site
La mallongigo SATS (Station Accommodation Test Site) inkluzivas la mallongigon TS (Test Site).
- SATS
-
Supplier Assessment Tracking System
- SAW/V
-
Satellite Attack Warning/Verification
- SBUE
-
Switch Backup Entry
- SC
-
Software Change
La mallongigo SC (Software Change) estas inkluzivita en la mallongigoj ISCCB (Internal Software Change Control Board), OSCR (Orbiter Software Change Request), SCCB (Software Change Control Board), SCR (Software Change Request) kaj SSCR (Support Software Change Request).
- SC
-
Statement of Capability
- SC
-
Statement of Compatibility
- SC/TC
-
Spacecraft Test Conductor
La mallongigo SC/TC (Spacecraft Test Conductor) inkluzivas la mallongigon TC (Test Conductor).
- SCAMPI
-
Standard CMMI Appraisal Method for Process Improvement
- SCAR
-
Safety Change Assessment Report
- SCAT
-
Storage, Checkout, And Transport
- SCATS
-
Simulation, Checkout, And Tracking System
- SCB
-
Schedule Control Board
La mallongigo SCB (Schedule Control Board) inkluzivas la mallongigon CB (Control Board).
- SCB
-
Selection Control Board
La mallongigo SCB (Selection Control Board) inkluzivas la mallongigon CB (Control Board).
- SCB
-
Software Control Board
La mallongigo SCB (Software Control Board) inkluzivas la mallongigon CB (Control Board).
- SCB
-
Specification Control Board
La mallongigo SCB (Specification Control Board) inkluzivas la mallongigon CB (Control Board).
- SCCB
-
Site Configuration Control Board
La mallongigo SCCB (Site Configuration Control Board) inkluzivas la mallongigojn CB (Control Board) kaj CCB (Configuration Control Board).
- SCCB
-
Software Change Control Board
La mallongigo SCCB (Software Change Control Board) inkluzivas la mallongigojn CB (Control Board), CCB (Change Control Board) kaj SC (Software Change).
- SCCB
-
Software Configuration Control Board
La mallongigo SCCB (Software Configuration Control Board) inkluzivas la mallongigojn CB (Control Board) kaj CCB (Configuration Control Board).
- SCD
-
Source Control Drawing
- SCD
-
Specification Change Drawing
- SCD
-
Specification Control Document
- SCD
-
Specification Control Drawing
- SCDP
-
Simulation Control Data Package
La mallongigo SCDP (Simulation Control Data Package) inkluzivas la mallongigon DP (Data Package).
- SCDR
-
Seller Critical Design Review
La mallongigo SCDR (Seller Critical Design Review) inkluzivas la mallongigojn CDR (Critical Design Review) kaj DR (Design Review).
- SCDR
-
Shuttle Critical Design Review
La mallongigo SCDR (Shuttle Critical Design Review) inkluzivas la mallongigojn CDR (Critical Design Review) kaj DR (Design Review).
- SCDR
-
Software Critical Design Review
La mallongigo SCDR (Software Critical Design Review) inkluzivas la mallongigojn CDR (Critical Design Review) kaj DR (Design Review).
- SCDR
-
Subcontractor Critical Design Review
La mallongigo SCDR (Subcontractor Critical Design Review) inkluzivas la mallongigojn CDR (Critical Design Review) kaj DR (Design Review).
- SCF
-
Satellite Control Facility
- SCF
-
Spacecraft Control Facility
- SCF
-
Sunnyvale Control Facility
- SCI
-
Seller Configuration Inspection
La mallongigo SCI (Seller Configuration Inspection) inkluzivas la mallongigon CI (Configuration Inspection).
- SCI
-
Software Customer Inspection
- SCIT
-
Standard Change Integration and Tracking
- SCL
-
Safety Checklist
- SCM
-
Software Configuration Management
La mallongigo SCM (Software Configuration Management) estas inkluzivita en la mallongigoj SCMO (Software Configuration Management Office) kaj SCMP (Software Configuration Management Plan), kaj ĝi inkluzivas la mallongigon CM (Configuration Management).
- SCM
-
System Configuration Management
La mallongigo SCM (System Configuration Management) inkluzivas la mallongigon CM (Configuration Management).
- SCM
-
Sofware Configuration Manager
La mallongigo SCM (Sofware Configuration Manager) inkluzivas la mallongigon CM (Configuration Management).
- SCMO
-
Software Configuration Management Office
La mallongigo SCMO (Software Configuration Management Office) inkluzivas la mallongigon SCM (Software Configuration Management).
- SCMP
-
Software Configuration Management Plan
La mallongigo SCMP (Software Configuration Management Plan) inkluzivas la mallongigojn CM (Configuration Management) kaj SCM (Software Configuration Management).
- SCN
-
Specification Change Notice
La mallongigo SCN (Specification Change Notice) estas inkluzivita en la mallongigoj OSCN (Orbiter Specification Change Notice), PSCN (Preliminary Specification Change Notice) kaj SCNP (Specification Change Notice Proposal), kaj ĝi inkluzivas la mallongigon CN (Change Notice).
- SCNP
-
Specification Change Notice Proposal
La mallongigo SCNP (Specification Change Notice Proposal) inkluzivas la mallongigojn CN (Change Notice) kaj SCN (Specification Change Notice).
- SCO
-
Start Checkout
- SCOE
-
Special Checkout Equipment
- SCR
-
SAIL Change Request
La mallongigo SCR (SAIL Change Request) inkluzivas la mallongigon CR (Change Request).
- SCR
-
Schedule Change Request
La mallongigo SCR (Schedule Change Request) inkluzivas la mallongigon CR (Change Request).
- SCR
-
Software Change Request
La mallongigo SCR (Software Change Request) estas inkluzivita en la mallongigoj OSCR (Orbiter Software Change Request), SSCR (Support Software Change Request), kaj ĝi inkluzivas la mallongigojn CR (Change Request) kaj SC (Software Change).
- SCRB
-
Software Configuration Review Board
La mallongigo SCRB (Software Configuration Review Board) inkluzivas la mallongigojn CR (Configuration Review), CRB (Configuration Review Board) kaj RB (Review Board).
- SCRB
-
STSOC Configuration Review Board
La mallongigo SCRB (STSOC Configuration Review Board) inkluzivas la mallongigojn CR (Configuration Review), CRB (Configuration Review Board) kaj RB (Review Board).
- SCRG
-
System Change Review Group
- SCS
-
Service and Checkout System
- SCTR
-
System Conformance Test Report
La mallongigo SCTR (System Conformance Test Report) inkluzivas la mallongigon TR (Test Report).
- SD
-
Specification Document
La mallongigo SD (Specification Document) estas inkluzivita en la mallongigoj TCRSD (Test and Checkout Requirements Specification Documentation) kaj TRSD (Test Requirements (and) Specification Document).
- SDBC
-
Software Development Baseline Control
La mallongigo SDBC (Software Development Baseline Control) inkluzivas la mallongigon SD (Software Development).
- SDE
-
Space Division Evaluator