‘005552’ temasıyla ilgili kısaltmalar
- Kod
-
Anlam
Dil
Temalar ve yerler
- ACSN
-
Advance Change Schedule Notice
- AGOSS
-
Automated Ground Operations Scheduling System
- AMPR
-
Aeronautical Manufacturer’s Planning Report
- ASAPTS
-
Automated Scheduling And Product Tracking System
- BCWS
-
Budgeted Cost for Work Scheduled
- CAPSS
-
Computer-Aided Planning and Scheduling System
La mallongigo CAPSS (Computer-Aided Planning and Scheduling System) inkluzivas la mallongigon PSS (Planning and Scheduling System).
- CASR
-
Cost And Schedule Reporting
- CDRS
-
Contract Data Requirements Schedule
La mallongigo CDRS (Contract Data Requirements Schedule) inkluzivas la mallongigojn CDR (Contract Data Requirements) kaj DR (Data Requirements).
- CIS
-
Cargo Integration Schedule
- CMS
-
Contract Master Schedule
La mallongigo CMS (Contract Master Schedule) inkluzivas la mallongigon MS (Master Schedule).
- COSPAC
-
Cost/Schedule Planning And Control
- CPS
-
Critical Path Schedule
- CSB
-
Change Schedule Board
- DSS
-
Department Summary Schedule
- EASE
-
Expert Activity Scheduling Environment
- EDS
-
Engineering Development Schedule
- EMS
-
Engineering Master Schedule
La mallongigo EMS (Engineering Master Schedule) inkluzivas la mallongigon MS (Master Schedule).
- FDS
-
Flight Design and Scheduling
- FMS
-
Functional Master Schedule
La mallongigo FMS (Functional Master Schedule) inkluzivas la mallongigon MS (Master Schedule).
- FOPS
-
Flight Operations Planning Schedule
- FOPSS
-
Flight Operation Product Scheduling System
- FOSMS
-
Facility Operation Scheduling and Monitoring System
- FOSO
-
Flight Operations Scheduling Officer
- ICDS
-
Interface Control Document Schedule
- IMS
-
Integrated Master Schedule
La mallongigo IMS (Integrated Master Schedule) inkluzivas la mallongigon MS (Master Schedule).
- IPSS
-
Integrated Project Scheduling System
- ISS
-
Integrated Scheduling System
La mallongigo ISS (Integrated Scheduling System) estas inkluzivita en la mallongigo NISS (National Integrated Scheduling System).
- JPASO
-
Joint Pacific Area Scheduling Office
- LMS
-
Logistics Master Schedule
La mallongigo LMS (Logistics Master Schedule) estas inkluzivita en la mallongigo PLMS (Program Logistics Master Schedule), kaj ĝi inkluzivas la mallongigon MS (Master Schedule).
- MATS
-
Master Manufacturing and Test Schedule
- MDS
-
Master Development Schedule
- MIS
-
Master Index Schedule
- MIS
-
Master Integrated Schedule
- MM&TS
-
Master Manufacturing and Test Schedule
- MPS
-
Master Production Schedule
- MPS
-
Master Program Schedule
- MRS
-
Master Repair Schedule
- MS
-
Master Schedule
La mallongigo MS (Master Schedule) estas inkluzivita en la mallongigoj CMS (Contract Master Schedule), FMS (Functional Master Schedule), LMS (Logistics Master Schedule), MSA (Master Schedule Authorization), MSC (Master Schedule Chart), PLMS (Program Logistics Master Schedule), PMS (Program Master Schedule), EMS (Engineering Master Schedule) kaj IMS (Integrated Master Schedule).
- MSA
-
Master Schedule Authorization
La mallongigo MSA (Master Schedule Authorization) inkluzivas la mallongigon MS (Master Schedule).
- MSC
-
Master Schedule Chart
La mallongigo MSC (Master Schedule Chart) inkluzivas la mallongigon MS (Master Schedule).
- MUPPS
-
Mission-Unique Planning and Processing Schedule
- NEWS
-
New Engineering Work Schedule
- NISS
-
National Integrated Scheduling System
La mallongigo NISS (National Integrated Scheduling System) inkluzivas la mallongigon ISS (Integrated Scheduling System).
- NTS
-
Near-Term Schedule
- OPS
-
Orbiter Project Schedule
- PASS
-
Planning and Scheduling System
- PEGASUS
-
Preliminary Expert Ground Analysis Scheduler
- PLINS
-
Payload Integration Schedule
- PLMS
-
Program Logistics Master Schedule
La mallongigo PLMS (Program Logistics Master Schedule) inkluzivas la mallongigojn LMS (Logistics Master Schedule) kaj MS (Master Schedule).
- PMS
-
Program Master Schedule
La mallongigo PMS (Program Master Schedule) inkluzivas la mallongigon MS (Master Schedule).
- PPS
-
Provisioning Performance Schedule
- PSC
-
Program Schedule Chart
- PSDR
-
Planning and Scheduling Document Record
- PSN
-
Program Schedule Network
- PSP
-
Project Schedule Plan
- PSS
-
Planning and Scheduling System
La mallongigo PSS (Planning and Scheduling System) estas inkluzivita en la mallongigoj CAPSS (Computer-Aided Planning and Scheduling System) kaj SPSS (Science Planning and Scheduling System).
- PSST
-
Periodic Significant Scheduled Task
- PVWS
-
Planned Value of Work Scheduled
- RSR
-
Release Schedule Record
- SCA
-
Schedule Change Authorization
- SCB
-
Schedule Control Board
La mallongigo SCB (Schedule Control Board) inkluzivas la mallongigon CB (Control Board).
- SCM
-
Schedule/Configuration Management
La mallongigo SCM (Schedule/Configuration Management) inkluzivas la mallongigon CM (Configuration Management).
- SCN
-
Schedule Change Notice
La mallongigo SCN (Schedule Change Notice) inkluzivas la mallongigon CN (Change Notice).
- SCR
-
Schedule Change Request
La mallongigo SCR (Schedule Change Request) inkluzivas la mallongigon CR (Change Request).
- SIS
-
Software Integrated Schedule
- SIS
-
Systems Integration Schedule
- SIS
-
Shuttle Integration Schedule
- SPDR
-
Scheduled Planning Drawing Release
- SPSS
-
Science Planning and Scheduling System
La mallongigo SPSS (Science Planning and Scheduling System) inkluzivas la mallongigon PSS (Planning and Scheduling System).
- SRSR
-
Schedule and Resources Status Report
La mallongigo SRSR (Schedule and Resources Status Report) inkluzivas la mallongigon SR (Status Report).
- SSPS
-
Space Shuttle Program Schedule
La mallongigo SSPS (Space Shuttle Program Schedule) inkluzivas la mallongigojn SS (Space Shuttle) kaj SSP (Space Shuttle Program).
- STARR
-
Schedule, Technical, And Resources Report
- SWG
-
Schedule Working Group
- TASPR
-
Technical And Schedule Performance Report
La mallongigo TASPR (Technical And Schedule Performance Report) inkluzivas la mallongigon PR (Performance Report).
- TSD
-
Test Start Date
- TSR
-
Test Schedule Report
- UM
-
Unscheduled Maintenance